The Hub Victoria, located at 123-151 Buckingham Palace Road, London, in the London Borough of Westminster, is a commercial led mixed-use extension and refurbishment scheme.

A black car driving down a street next to tall buildings.

McLaren were appointed to provide the extension of the existing office accommodation to provide c.100,000sqft (NIA) of additional space at roof level.

In addition to extension of and repositioning of the retail units at Ground Floor level and refurbishment of the existing receptions, including works to remove elements of the existing canopy and alterations to the stone colonnade to improve the public realm.

Key points

Technically Complex
United Kingdom
Offices
1
BREEAM-certified ‘Excellent’
1
NR & TfL interface
1
Live environment / Occupied buildings
1
Two blocks of eight-storeys
1
Ground floor retail and leisure facilities
1
100,000 sq ft of commercial office space

Working in a live environment

The works are being undertaken in a live environment, with the commercial floors remaining occupied throughout. We are managing this by working to a comprehensive Construction Management Plan, which was developed and agreed with all parties prior to starting work.

‍

Refurbishment works to each floor are being completed using a phased strategy, including out of hours works as required.

‍

Protected public access routes have been installed around the building, which includes top grade hoarding to maintain a quality image.  To minimise disruption from noise, works are being carried out during three separate agreed windows of time during the day. Noise and vibration monitors have also been placed across all floors. We have a dedicated Tenant Liaison Manager who is working with the tenants to manage and resolve any issues that may arise.

‍

Keeping Building Services Live

As the buildings remain in operation, keeping the services live is a key focus. We are providing temporary service connections (power, water, gas) whilst we carry out the service diversions, relocations, and enhancement works.

‍

Traffic and Pedestrian Management

The project is being undertaken on an island site surrounded by four separate roads, including a row of adjacent bus stops for local buses and long-distance coaches. Traffic management is a key focus and we have engaged with TfL from the outset to develop our logistics strategy around their requirements.

‍

The building is also located directly adjacent to Victoria Station, with a local footfall of several thousand per day. We are managing this by providing six full-time traffic marshals to manage all vehicle and pedestrian movements. We hold regular meetings with the relevant authorities to ensure that our upcoming deliveries and vehicles movements are scheduled around local requirements.

‍

Structural Alterations

Three new floors are being constructed on each building, requiring significant structural enhancements. From the outset, we have worked with a specialist temporary works engineer to develop a propping strategy for each floor whilst the structural works are undertaken. Alterations have also been carried out at ground floor level to adjust the steel frame for the extensions to the retail units.


‍

Maintaining a Waterproof Roof Level

Due to the removal of the existing roof level, maintaining a watertight finish has been essential and a big challenge. We have provided a temporary waterproof layer, installed as we removed the existing roof. We have a dedicated member of staff on site, who is managing any breaches to the temporary layer whilst the works are carried out to prevent leakage issues.

Three views of The Hub Victoria: the extended building from the street, the stone colonnade and the refurbished reception
The Hub Victoria on Buckingham Palace Road, with its new glazed upper floors above the stone base
Landscaped roof terrace with planters beside the glazed extension at The Hub Victoria
View through the glazed rooftop extension at The Hub Victoria towards the station roof
The Hub Victoria under construction, with a tower crane above and a bus passing on the street
Refurbished reception with green sofas and a feature staircase at The Hub Victoria
Full-height glazing on the new upper floors of The Hub Victoria, overlooking Victoria Station
No items found.